Prepare the Site
Select a stable wall, confirm clearances, check local electrical rules, and make sure the installation area is protected from avoidable heat, water, and impact.
Connect and Configure
After mounting the battery, installers should connect power and communication cables according to the manual, then configure inverter battery parameters and communication protocol.
Commission Safely
Before handover, verify voltage, polarity, breaker status, communication, charging behavior, and monitoring data.